Railways Track Bed Formations – Basics Railway Track bed formation foundations,
And the formation of the trackbed can affect the
Actual track quality and performance of railways.
Usual forms of cross-sections:
The Naturally occurring soil is known as subgrade and,
When it is prepared to receive the ballast and track, it is called ‘Formation’.
When a formation is raised on bank of earth,
It is called an embankment. When it is made after cutting the ground,
It is called ‘cutting’. In case of cutting the track is laid below ground level,
Thus, the required portion to be excavated.
Normally a railway line will be constructed on a flat ground,
Or on embankment or cutting or in a combined section.
When the formation is to be made on embankment or cutting,
Various features should be carefully considered.
Sloped to be provided to the sides of the formation should be
Slightly flatter than the angle of repose of the material. The slopes in cutting vary from 1.5 to 1 or steeper.
The size of the drain depends on the rainfall data.
Sometimes it becomes unavoidable to lay tracks on a very poor (or undesirable) soil.
In such cases, it becomes necessary to improve and,
Strengthen the nature of soil by some suitable methods.
Under such circumstances, the following methods are used.
This method is widely used and is adopted if a poor quality soil comes across a track
Such as black cotton soil which is a fine black loamy soil.
This soil tends expanding (or swelling)
When moist and of caking and cracking heavily when dry.
Tracks laid on the formation of maintain.
In rainy season, the soil fills up ballast interest less,
The track in the worst places gets sodden and spongy track is reduced. In hot weather, the cracks are formed and the ballast is lost in filling up these cracks.
Thus, the alignment as well as level is disturbed and with mud filling the interstices, the track loses. Its resiliency, therefore, for these very reasons,
A layer of moorum varying in thickness from 300 mm ” ” to 600 mm is laid under the ballast. This layer distributes the pressure of the load and prevents the ballast
From being lost in the cracks of the soil.
Instead of moorum, other materials such as ashes, concrete,
Slabs, rubber, unserviceable sleepers, etc…
They are also used and are found quite satisfactorily.
In this method, steel tubes of 30 mm in diameter and 1.5 m.
The tubes are driven into the foundation at an angle such,
That the end of the tube is nearly under the rail.
The cement grout is forced under a pressure of 0,7 N/mm2 through these tubes. The proportion of cement grout depends on the type and condition of formation. The concert grout spreads through the poor soil and consolidates it. The steel tubes are then gradually taken out.
This method of strengthening the track laid on poor is most widely used in
Development countries like America. In this method, a vertical bore about 300 mm “,
Diameter is made in the ground by driving a wooden pile. The wooden pile is then withdrawn and space is filled with sand and is well rammed. The sand piles are driven in the pattern as shown.
It is also arranged that the cross-sectional area of the sand piles is about 20% of the formation area.
Thus, the top section of the formation is covered with sand
Which makes the track stable on poor soil.
Also, read:
In this method,
Chemicals are used in place of cement grout to consolidate the soil.
In the world of modern vehicles, the engine control system is a complex network that… Read More
When you hear "vehicle body mount," it's easy to think about all the flashy parts… Read More
Introduction The fuel injection system is a crucial component of modern internal combustion engines, responsible… Read More
The function of the rail is to distribute fuel pressurized by the supply pump to… Read More
Introduction The Engine Coolant Temperature (ECT) sensor plays a critical role in maintaining engine performance… Read More
Introduction If you own a diesel engine vehicle, the Diesel Injection Pump plays a crucial… Read More
View Comments